The last of the structural steel is now in place so the second storey is getting underway with its flooring being installed this week. Pictured is the internal view from the living room and looking back towards the kitchen (on the right), hall (on left) and second living room (behind the kitchen).
0 Comments:
Post a Comment
<< Home